Skip to main content
INDUS
Precision Motion & Automation
Systems Engineering

System Integration Engineering

From Standalone Subsystems to a Functioning Automated Cell

System integration connects mechanical actuators, servo drives, robot controllers, safety systems, sensors, and plant-level supervisory controls into a single deterministic production system. INDUS engineering engagements define mechanical, electrical, and control boundaries before hardware commitment.

Submit Engineering Spec Sheet

Engineering Scope

Defining System Boundaries Before Integration

Clear boundary definition is the first integration step. Each subsystem — robot controller, servo drive, safety PLC, HMI, and plant MES — has defined input/output interfaces, signal ownership, and timing responsibilities.

Mechanical Boundary

Mounting interfaces, load paths, cable routing envelope, maintenance clearances, and thermal dissipation zones.

Electrical Boundary

Power distribution, cabinet earthing, cable segregation (power vs signal), connector standards, and IP rating compliance.

Control Boundary

Fieldbus master/slave topology, cyclic I/O mapping, process data objects, safety channel wiring, and emergency stop circuit architecture.

Communication Architecture

Supported Fieldbus Topologies & Control Layers

Industrial fieldbuses carry deterministic cyclic process data between controllers and drives. The choice of protocol depends on controller OEM, required cycle time, network topology, and installed equipment.

EtherCAT

Sub-millisecond distributed clock synchronization (DC). Used for high-axis-count multi-robot cells. Line or ring topology.

PROFINET IRT

Isochronous real-time profile. Common in Siemens-ecosystem plants. Supported by most major drive manufacturers.

EtherNet/IP

CIP protocol. Common in Rockwell Automation environments. Suitable for motion and I/O integration.

CANopen / DeviceNet

Older installed-base protocols. Lower bandwidth; suitable for low-axis-count or legacy machine retrofit.

Protocol Compatibility Note: Protocol compatibility depends on the specific robot controller, drive, and safety PLC combination selected for the project. INDUS engineers verify protocol support during the Define phase.

Integration Architecture

Typical Integration Components

Robot Controller

Motion programming, kinematic model

Servo Drive Network

Axis torque/velocity loops

Safety PLC

Emergency stop, STO, zone management

HMI / Operator Panel

Recipe management, alarm display

Sensors & Vision

Trigger, result, coordinate handshake

Plant MES / SCADA

Production orders, batch data, OEE

Signal & Sequence Requirements

Typical signals managed across the integration boundary:

  • Digital I/O handshakes
  • Robot program start/stop
  • Conveyor interlock
  • Vision trigger/result
  • Safety door monitoring
  • Fault annunciation

Retrofit Integration

Legacy Machine Integration Considerations

Existing production lines often contain legacy PLCs, proprietary serial protocols, and non-standard signal conditioning. Integration projects require interface documentation, protocol conversion, and signal isolation before new automation hardware is installed.

  • 01

    Obtain existing wiring schematics and PLC program documentation.

  • 02

    Identify non-standard signal voltages, loop currents, and serial baud rates.

  • 03

    Define gateway or protocol converter requirements and validate timing budgets.

Project Execution

Integration Testing & Commissioning Sequence

01PHASE 01

FAT

Factory Acceptance Test

Individual subsystem verification at supplier facility. Axis homing, safety circuit continuity, network communication, and motion profile validation.

02PHASE 02

Pre-SAT

Installation Readiness

Mechanical alignment, cable routing, earthing continuity, and cabinet thermal verification at customer site before power-on.

03PHASE 03

SAT

Site Acceptance Test

Full system power-on sequence, coordinated motion routines, I/O handshake verification, and alarm response testing.

04PHASE 04

Handover

Handover

Operator training, validated backup of all controller projects, as-built documentation, and agreed preventive maintenance schedule.

Start an Integration Discussion

Define Your System Integration Scope

Share your existing equipment inventory, fieldbus preferences, safety category requirements, and production throughput targets. Our integration engineers will define the interface architecture and project milestones.

Submit 7-Section Spec Sheet